All work

03 · Laser Systems & Compliance

Netflix Aviation — Hangar 43

Netflix Aviation · Burbank, California — ongoing

An FP-300 maintaining a five-aircraft Gulfstream fleet, and the complete Class IV laser safety and regulatory compliance program written for the hangar that runs it.

Training the Netflix Aviation maintenance team around a Gulfstream landing gear during FP-300 laser cleaning, Hangar 43, Burbank

Training the Netflix Aviation team on the landing gear — Hangar 43, Burbank

5
Gulfstream fleet maintained
Class IV
Laser safety program authored
Part 145
EASA compliance and SMS integration
FAA · OSHA · FDA
Regulatory frameworks documented

The project

Netflix Aviation operates a fleet of five Gulfstream corporate jets out of Hangar 43 in Burbank — three hangars down from Jay Leno's Garage. An FP-300 handles corrosion and coating removal across that fleet, and has done since delivery.

The machine was the smaller half of the job. A 300 W Class IV laser inside a Part 145 maintenance hangar falls under OSHA, the FDA's laser product performance standard, FAA guidance for laser operations near aircraft, and — for European-certificated work — EASA, all at once. A shop that cannot document compliance with those cannot legally run the equipment, whatever it can do to a part.

So 432 Design wrote the program. The Laser Safety Manual covering hazard evaluation, engineering controls, interlocks and beam stops, PPE to ANSI Z136 at 1064 nm, access control and signage, pre-operation checklists, start-up and shutdown procedures, maintenance logging, emergency response and a semi-annual audit. The Laser Safety Officer role, its qualifications and its authority. The FAA side, including AC 70-1B and the Form 7140-1 process where a beam path can reach open hangar doors.

Then the harder piece: mapping all of it into a Safety Management System for EASA Part 145 — safety policy and measurable objectives, accountabilities from the Accountable Executive down to the technician, a risk register, hazard reporting under a just-culture policy, corrective-action tracking and a safety performance dashboard. The approach was to enhance rather than replace: the existing procedures stayed valid and became components of the larger SMS framework.

And the training. On-site, on their own aircraft: laser cleaning landing gear, reading heat levels and watching thermal build-up in real time so the process stays inside what the component can take.

DisciplineLaser Systems

Detail

Checking surface temperature with an infrared thermometer during FP-300 laser cleaning of a Gulfstream landing gear
Reading heat build-up in real time — the part of the process that protects the component
Laser cleaning a Gulfstream landing gear with the FP-300 at Hangar 43
Gulfstream landing gear on jacks during FP-300 laser cleaning
Netflix Aviation and FeatherPulse FP-300 crew shirts made for the maintenance team

Something like this?

Tell us what you're trying to do and we'll tell you what it takes.

Start a project